The placing of the flowers still need to be confirmed.
Monday, 28 March 2011
Monday, 21 March 2011
week 6: Further Background Test
This background I had made after our meeting. I had used Eva's storyboard to understand the feel of the background that Jon wish to have in the film. This background have taken me 3 hours and 45 minutes to do.
Week 6: Background tests
In order to speed up the work flow we had decided to share the workload of the 2D production of thing. I will be helping Nemo with the backgrounds and Eva will be drawing the lines for the Characters. This is the first attempt of the background work i Had done before Jon had told me his vision. These pictures had taken me 3.5 hours to do.
Week 5: Timetable
Hiya Guys this is the Timetable that we had made, so we can get things moving. Again sorry about the delay had trouble putting things up as i had used Microsoft Office programs.
Week 5: Storyboard part 2
This is the first attempt the story board using Jon script. Eva, Nemo and I each attempted to do sections of the storyboard so we can speed up the process and also recognise each of the 2d Animators strenghs.
week 5: Powerpoint presentation
Hiya Guys story about the delay, I had trouble putting the powerpoint presentation on, so i figured out an alternative way of doing it so yayy. So here it is. I spent an hour and 15 minutes doing it.