Monday, 28 February 2011

Saturday and Monday Meetings 26.02.10 and 28.02.10

We had a meeting on Saturday for an hour. The people who were able to attend are the following:
  • Nemo
  • Ava
  • Jon
  • Myself
The meeting was successful. we discussed the story in more detail and outlined and allocated each persons task for the week. Jon will be going away for the week, so we had to figure out what we can do while he is away.

The jobs that were allocated was that me, Ava and Nemo will be doing a detailed storyboard for thursday, so when Jon returns he can do an animatics for the film by Tuesday next week.

In todays meeting the storyboard artist, myself, Ava and Nemo met up to discuss who is drawing what scene. It was also a very successful meeting which was also approximately an houe and 15 minutes. we were also discussing the 2D technique that can be used.

Wednesday, 23 February 2011

Producer Review

I have made my Blog today, with all the information regarding the teams and task.

-The final script of the story will be given to us my Jon tomorrow via the blog.

-Our first meeting will be held on the Saturday the 26th of February

- The film will be roughly 2-3 minutes long

- The Title of the film is still to be confirmed

Week 4: Preparation - The Team members

- Team Member:
 - Pre Production Needs
  • Storyboard Design
  • Animatics
  • Scenery and landscape Design and development
  • Character design and development
- Post- Production needs
  • 2D animator
  • 3D animator
  • Sound and Audio composer
  • Film Editor
Current Status of the Project:

  • Jon - Finalising The script
  • Eva and Nemo - working on Moodboards for the animation
  • Eva - Working on first draft of the story board.

Addition to team members:
 If any addition information need to be added please notify me as soon as possible